Map Marker Key

Solar
Development
Solar
Operational
Wind
Development
Wind
Operational
Geothermal
Development
Geothermal
Operational
Wave
Development
Wave
Operational

Renewable NW is not an owner or operator of any projects listed on this page. Please do not contact us with with project-specific questions.

Withrow Wind Farm

  1. Home
  2. »
  3. Withrow Wind Farm
State:
  • WA
County: Douglas
Type of Resource:
  • Wind
Operating Status:
  • Proposed
Project Stage: Development
Capacity: 70 MW
Developers: Douglas Co PUD
Locale:

NE of Withrow, WA, 12 miles NE of Waterville, west of State Rte 172.

BPA: Y
Description:

Project proposed to be 70 MW using 28 - 2.5 MW turbines. Douglas PUD originally planned a 10 turbine project, then expanded to an 106 turbine project (1.5 MW turbines) of up to 160 MW and would straddle State Rte 172. Enviro study found sage-grouse leks in area so project redesigned to 70 MW placed west of State Rte 172. Possibly operational 2011 or 2012. WDFW involved in sage-grouse study. Study will be intensive in 2010 and continue for five years to see if wind project has any affect on sage-grouse populations.

Scroll to Top