Windy Point / Windy Flats III

  1. Home
  2. »
  3. Windy Point / Windy Flats III
State:
  • WA
County: Klickitat
Type of Resource:
  • Wind
Operating Status:
  • Approved
Project Stage: Development
Capacity: 100 MW
Developers: Windy Point Partners (Cannon)
Partners: SCPPA
Locale:

Klickitat Co, WA, about 4.8 mi. SE of Goldendale.

BPA: Y
Description:

This is phase III of the Windy Point and Windy Flats projects being developed with power to go to SCPPA.

This single project was originally two projects in the RNP list -- Windy Point I (2010/11) and Windy Point II (2010/11). These were combined into this single project on 6/28/12 to align the RNP list with the way SCPPA describes the project.

Full project notes:
Initial permit request for WP was up to 61 turbines and 242.5 MW. A later layout change reduced it to 182.5 MW. The first 137.6 MW was built and sold off as Tuolumne. This project was then combined with Windy Flats and WIndy Point 2 with power sold to SCPPA. It is one phase of a larger 500 MW project in combo with Windy Point II (2 phases, first phase of which was 137.6 MW Tuolumne) and Windy Flats. 400 MW was completed in 2009. The remaining 100 MW was an expansion for 2010/11.

Sources:
http://archive.awea.org/Projects/ProjectsNew.aspx?s=Washington (AWEA)
http://www.scppa.org/pages/projects/windy_point.html (SCPPA)