Windy Point / Windy Flats II

  1. Home
  2. »
  3. Windy Point / Windy Flats II
State:
  • WA
County: Klickitat
Type of Resource:
  • Wind
Operating Status:
  • Operating
Project Stage: Operating
Capacity: 262.2 MW
Developers: Windy Point Partners (Cannon)
Year: 2009
Month: Oct
Number of Turbines: 114
Partners: SCPPA
Locale:

Klickitat Co, WA, about 4.8 mi. SE of Goldendale.

BPA: Y
Description:

Project consists of 202.4 MW of Windy Point II (2009 and 3Q09 on AWEA list) and 59.8 MW of Windy Flats II (Windy Flats IIa on AWEA list) bought by SCPPA, totaling 262.2 MW. Consists of a total of 114 Siemens 2.3 MW turbines. Location determined from Klickitat County wind map project.

This single project listing was previously listed as two separate projects on the RNP list -- Windy Flats and Windy Point IIa (2009). These were combined into this single project on 6/28/12 to be in alignment with SCPPA's description as a single project. AWEA lists as three separate projects on their list.

An expansion to be built 2010/2011.

Other notes:
Initial permit request for WPII was up to 61 turbines and 152.5 MW. Noted later on Klickitat wind map that the project was reduced to 130 MW. One phase of a larger 500 MW project in combo with Windy Point II (2 phases, first phase of which was 137.6 MW Tuolumne) and Windy Flats. 400 MW was completed in 2009. The remaining 100 MW was for an expansion for 2010/11.

Sources:
http://archive.awea.org/Projects/ProjectsNew.aspx?s=Washington (AWEA)
http://www.scppa.org/pages/projects/windy_point.html (SCPPA)