Map Marker Key

Solar
Development
Solar
Operational
Wind
Development
Wind
Operational
Geothermal
Development
Geothermal
Operational
Wave
Development
Wave
Operational

Renewable NW is not an owner or operator of any projects listed on this page. Please do not contact us with with project-specific questions.

Tuolumne (Windy Point I)

  1. Home
  2. »
  3. Tuolumne (Windy Point I)
State:
  • WA
County: Klickitat
Type of Resource:
  • Wind
Operating Status:
  • Operating
Project Stage: Operating
Capacity: 136.6 MW
Developers: Windy Point Partners (Cannon)
Year: 2009
Month: May
Number of Turbines: 62
Partners: Turlock Irrigation Dist.
Locale:

Klickitat Co, WA, about 6 mi. SE of Goldendale and stretching 11 mi. east to Imrie and Hoctor Ridge projects.

BPA: Y
Description:

62 turbines. (20 REpower 2.0 MW and 42 Siemens 2.3 MW)
This first phase bought by SCPPA, started up in May 2009, and then sold to Tuolumne in June 2009.

Note: This project listed as two separate projects on AWEA list because the project used turbines from different manufacturers.

Sources:
http://archive.awea.org/Projects/ProjectsNew.aspx?s=Washington (AWEA)
http://www.scppa.org/pages/projects/windy_point.html (SCPPA)

Scroll to Top