Map Marker Key

Solar
Development
Solar
Operational
Wind
Development
Wind
Operational
Geothermal
Development
Geothermal
Operational
Wave
Development
Wave
Operational

Renewable NW is not an owner or operator of any projects listed on this page. Please do not contact us with with project-specific questions.

Stateline (OR side)

  1. Home
  2. »
  3. Stateline (OR side)
State:
  • OR
County: Umatilla
Type of Resource:
  • Wind
Operating Status:
  • Operating
Project Stage: Operating
Capacity: 122.8 MW
Developers: NextEra
Year: 2001
Number of Turbines: 186
Partners: Iberdrola
Locale:

On Oregon side of border between Touchet/Walla Walla area in WA and Pendleton area in OR.

BPA: Y
Description:

186 Vestas V47 660 kW turbines. (Original was 83.16 MW cap. with 126 turbines. Expansion was 39.6 MW with 60 turbines.) Of original OR/WA project, 175 sold to Seattle City Light, 90 MW to BPA, and the rest marketed by Iberdrola with destination unknown. FPL Energy was original name of the developer. FPL changed name to NextEra Energy Resources in 2009.

Scroll to Top