Map Marker Key

Solar
Development
Solar
Operational
Wind
Development
Wind
Operational
Geothermal
Development
Geothermal
Operational
Wave
Development
Wave
Operational

Renewable NW is not an owner or operator of any projects listed on this page. Please do not contact us with with project-specific questions.

River Bend Solar

  1. Home
  2. »
  3. River Bend Solar
State:
  • MT
County: Sweet Grass
Type of Resource:
  • Solar
Operating Status:
  • Operating
Project Stage: Operating
Capacity: 2000 KW
Developers: Enerparc; Cypress Creek
Year: 2017
Partners: NorthWestern Energy
Locale:

The 2 MW River Bend Solar project is located SW of Reed Point, just west of the cemetary south of I-90 in Sweet Grass Co., MT.

BPA: N
Description:

Enerparc / Cypress Creek's 2 MW River Bend Solar project is located in Reed Point, MT. The project is SW of Reed Point, just west of the cemetary south of I-90 in Sweet Grass Co., MT.

River Bend Solar was initially developed by Cypress Creek, then sold to Enerparc before construction.

http://bigtimberpioneer.net/content/river-bend-solar-farm-begins-construction

http://www.kulr8.com/story/34254787/why-developers-are-building-solar-panels-in-reed-point

http://www.ktvq.com/story/34950147/solar-plants-nearly-complete-in-reed-point-and-hardin

http://www.stillwatercountynews.com/letters-editor/solar-farm-along-i-90-reed-point-real-eyesore

Scroll to Top