Map Marker Key

Solar
Development
Solar
Operational
Wind
Development
Wind
Operational
Geothermal
Development
Geothermal
Operational
Wave
Development
Wave
Operational

Renewable NW is not an owner or operator of any projects listed on this page. Please do not contact us with with project-specific questions.

Pepsi Cola of Klamath Falls

  1. Home
  2. »
  3. Pepsi Cola of Klamath Falls
State:
  • OR
County: Klamath
Type of Resource:
  • Solar
Operating Status:
  • Operating
Project Stage: Operating
Capacity: 172 KW
Developers: AES
Year: 2004
Month: December
Partners: ETO; ODOE; 3 Phases; PacifiCorp
Locale:

on 3 facilities in Lakeview and Klamath Falls, OR

BPA: N
Description:

Largest PV system in the NW when built in Dec 04. The main facility has the largest roof integrated solar panel system in the Pacific Northwest totally 132 KW. 1,048 solar laminates are bonded to its standing seam metal roof. All 3 PV systems are designed to supply up to 100% of the buildings' loads on an annual basis. These are the first commercial net zero" buildings in Oregon."" Location confirmed with Google Earth."

Scroll to Top